Lockout/tagout for building equipment trades
No general written program No written lockout/tagout program for construction work. Electrical lockout and tagging are covered by 1926.417 and Subpart K.
NAICS 238210, 238220, 238290. Small crews who work inside other contractors' sites and customers' buildings, often as subcontractors.
What the rule text says
The lockout/tagout standard, 1910.147, does not cover construction employment (1910.147(a)(1)(ii)(A)). Construction has narrower rules: tags on deactivated controls and circuits (1926.417) and tagging or locking unsafe equipment out of service (1926.20(b)(3)). Full rule summary.
What it means in this trade
Electrical, plumbing and HVAC contractors deal with energy more than any other group, but 1910.147 excludes construction employment and also excludes exposure to electrical hazards from work on conductors and equipment in electric-utilization installations, which is covered by Subpart S of Part 1910 (1910.147(a)(1)(ii)(A), (D)). In construction, 1926.417 is a short tagging rule: tag controls deactivated during work, render deenergized equipment or circuits inoperative and tag every point where they can be energized, and identify plainly the equipment or circuits being worked on. Alongside it, 1926.416(a)(1) bars working near an electric power circuit that you could contact unless it is deenergized and grounded or effectively guarded. Service work on operating customer machinery is where coverage questions arise, so ask OSHA.
Check these in the rule
- Tags identify plainly the equipment or circuits being worked on. (29 CFR 1926.417(c))
- Do not work near a circuit you could contact unless deenergized and grounded, or guarded. (29 CFR 1926.416(a)(1))
- Electrical hazards in electric-utilization installations are covered by Subpart S. (29 CFR 1910.147(a)(1)(ii))
The full list of what the rule says the program must contain (5 items, each with its paragraph) is on the lockout/tagout page. Source: 29 CFR 1910.147, 29 CFR 1926.417, 29 CFR 1926.20 (eCFR text as of Nov 24, 2026).
29 CFR 1910.147 (general industry) is #3 on OSHA's preliminary most-cited list for fiscal year 2026. That list covers all industries, and 1910.147 excludes construction employment.
OSHA's maximum penalty for a serious violation is $16,550 (OSHA penalties).
Open federal bids in your trade
213 open federal notices on SAM.gov as of Nov 28, 2026 in the busiest building equipment codes. Free weekly digest on the home page.
- 238220 Plumbing, Heating, and Air-Conditioning Contractors (105 open)
- 238210 Electrical Contractors and Other Wiring Installation Contractors (75 open)
- 238290 Other Building Equipment Contractors (33 open)
Source: SAM.gov Contract Opportunities public extract.
Same trade, other programs
- HazCom program
- Emergency action plan
- Fall protection plan
- PPE assessment
- Respirator program
- Silica exposure plan
- 300 log and 300A
Same program, other trades
- General building contractors
- Heavy and civil engineering contractors
- Foundation, structure and exterior trades
- Finishing and other specialty trades
Lockout/tagout (energy control) procedures: all trades · All 8 programs for building equipment · Finder
Keep my email for the yearly 300A reminder
Free. One reminder a year before Feb 1, plus a note if these rules change. No email is being sent yet; the first message will be one confirmation email, and nothing else until you click it.
We store your email, trade, signup page, time and country only. Never sold or shared. Privacy.
Informational, not legal advice. Reads the text of federal OSHA rules (29 CFR, eCFR text as of Nov 24, 2026); not a compliance determination. State Plans can differ. Not affiliated with or endorsed by OSHA or the U.S. Department of Labor. Method and sources.