Lockout/tagout for heavy and civil engineering contractors
No general written program No written lockout/tagout program for construction work. Equipment yards and shops are the case to check.
NAICS 237110, 237120, 237130, 237210, 237310, 237990. Big equipment, trenches, and long projects with their own sites. Many jobs are public work, which is also where Bid Radar finds federal notices.
What the rule text says
The lockout/tagout standard, 1910.147, does not cover construction employment (1910.147(a)(1)(ii)(A)). Construction has narrower rules: tags on deactivated controls and circuits (1926.417) and tagging or locking unsafe equipment out of service (1926.20(b)(3)). Full rule summary.
What it means in this trade
Heavy and civil firms maintain loaders, excavators, pavers and crushers. On the job site the construction rules apply: 1926.20(b)(3) requires equipment or tools not in compliance with Part 1926 to be tagged or have controls locked to render them inoperable, or be removed from the place of operation, and 1926.20(b)(4) limits equipment operation to employees qualified by training or experience. In a permanent yard or shop that services machines, the question is whether that work is construction employment (excluded by 1910.147(a)(1)(ii)(A)) or general industry (covered). The answer depends on the work and the place, and OSHA's free On-Site Consultation program can help you ask. If 1910.147 does cover a shop, it requires documented procedures and a periodic inspection at least annually.
Check these in the rule
- Tag or lock out equipment that does not comply with Part 1926. (29 CFR 1926.20(b)(3))
- Only employees qualified by training or experience operate equipment. (29 CFR 1926.20(b)(4))
- If general industry applies: documented procedures and annual inspection. (29 CFR 1910.147(c)(6))
The full list of what the rule says the program must contain (5 items, each with its paragraph) is on the lockout/tagout page. Source: 29 CFR 1910.147, 29 CFR 1926.417, 29 CFR 1926.20 (eCFR text as of Nov 24, 2026).
29 CFR 1910.147 (general industry) is #3 on OSHA's preliminary most-cited list for fiscal year 2026. That list covers all industries, and 1910.147 excludes construction employment.
OSHA's maximum penalty for a serious violation is $16,550 (OSHA penalties).
Open federal bids in your trade
414 open federal notices on SAM.gov as of Nov 28, 2026 in the busiest heavy and civil codes. Free weekly digest on the home page.
- 237990 Other Heavy and Civil Engineering Construction (268 open)
- 237310 Highway, Street, and Bridge Construction (93 open)
- 237110 Water and Sewer Line and Related Structures Construction (53 open)
Source: SAM.gov Contract Opportunities public extract.
Same trade, other programs
- HazCom program
- Emergency action plan
- Fall protection plan
- PPE assessment
- Respirator program
- Silica exposure plan
- 300 log and 300A
Same program, other trades
- General building contractors
- Foundation, structure and exterior trades
- Building equipment trades
- Finishing and other specialty trades
Lockout/tagout (energy control) procedures: all trades · All 8 programs for heavy and civil · Finder
Keep my email for the yearly 300A reminder
Free. One reminder a year before Feb 1, plus a note if these rules change. No email is being sent yet; the first message will be one confirmation email, and nothing else until you click it.
We store your email, trade, signup page, time and country only. Never sold or shared. Privacy.
Informational, not legal advice. Reads the text of federal OSHA rules (29 CFR, eCFR text as of Nov 24, 2026); not a compliance determination. State Plans can differ. Not affiliated with or endorsed by OSHA or the U.S. Department of Labor. Method and sources.